Renovation of Port Tawfik Port

Renovation of Port Tawfik Port

Renovation of Port Tawfik Port

LocationSuez – Red Sea
OwnerRed Sea Port Authority
Cost132 000 000 LE
StatusDetailed Design
Date2007

Scope of Work

Urban Planning, feasibility studies, marine work design, Architectural & Structural design, electro-mechanical design, landscaping design, tender document & execution drawing preparation, and construction supervision.

Project Description

The project main aim is to separate the circulation of the port different users by creating 3 main different zones separated by inner fences as the following:

  • Zone 1 Passengers' zone which considered as the spinal zone.
  • Zone 2 Commercial circulation zone.
  • Zone 3 Passengers' Companions zone.

The project included re-development of inner and outer roads, Quay service roads, Quay pavement, passenger's yards, parking areas, trip tick yards.

In addition to the construction of needed buildings and its services, and re-development the infra structure such as drainage and rain water sewage network, firefighting, lighting and information network to fulfill the different zones needs according to its use.

The design included re-development the existing passengers hall and quay service building and construction of a new maritime station of about 15 000 m2 as extension to the existing one, that includes passenger arrival and departure halls , luggage handling areas, custom hall, all the commercial and administration services needed.