Planning & Renovation of Al- Hamraween Mineral Port

Planning & Renovation of Al- Hamraween Mineral Port

Planning & Renovation of Al- Hamraween Mineral Port

LocationHamraween – Red Sea (40 km south of Safaga)
OwnerRed Sea Port Authority
StatusPreliminary Design & Master Plan
Date2014

Scope of Work

Master plan, economic feasibility and pre-engineering design study

Project Description

This plan is part of large development plan for Safaga – Qusier – Qena triangle (Golden triangle) that includes the enlargement of the currently small Hamraween port to be a large port specialized in dry bulk handling of mineral products of mining industry, the port will include 700 meter quay, turning circle, 6 specialized dry bulk terminal. In addition a back industrial zone will be developed including extension of rail way from Safaga and replaning of high way road.

Al- Hamraween