Elkhoms port container terminal project

Elkhoms port container terminal project

Elkhoms port container terminal project

LocationEl Khoms Marine port -Tripoli – Lybia
OwnerMarine Port Authority - Lybia
Cost100,000,000 L.E
StatusUnder Construction
Date2009

Scope of Work

Terminal Planning, feasibility studies, marine work design, Infrastructure & Structural design, electro-mechanical design, tender document & execution drawing preparation, and construction supervision.

Project Description

Project aims to convert an existing general cargo quay to a container terminal. The capacity will be around 200,000 TEU per / annum for stage (1) & (2) of the project which include the 15 Hectare area.

the project shall be executed in two phases

phase (1) comprises the construction of containers yard with area 7.5 hectares.Including:

  • Planning of the available area and structural design of base and sub base layers for yards and roads .
  • Design of final paving layers for yards and roads .
  • Design of drainage networks.
  • Design of lighting network and high masts.
  • Design of the electrical distribution panel board for the reefers.
  • Design of the fire fighting network.
  • Design of (C.F.S) units according to international specs of combined containers.
  • Preparing all tender document.

Phase (2) comprises the completion of container yard to be 15 hectare in total including similar works as phase (1) in addition to::

  • Design of civil works required for rail mounted gantry crane.
  • Design of electronic control system .
  • Design of electrical works of high masts.
  • Preparing all tender documents for these works.