Scope of Work

Marine design & Structural design, tender document and execution drawing preparation.

In the context of developing the areas northern of the spinal road in Alexandria port, quay 28 was designed and constructed to close the area of Mahmoudia canal towards the sea and to make benefit of using the area behind as cargo storage areas after adequate backfilling.

The quay was designed using pre-cast concrete blocks to match the original design of other quays siding with it. The total length of the quay is 65 m with depth reaching 12 m. The area behind the quay was backfilled using dolomite crushed stones and covered by concrete floor tiles specially designed to bear the design load of cargo storage areas