AlHaya Factory For Mineral Water, Siwa

AlHaya Factory For Mineral Water, Siwa

AlHaya Factory For Mineral Water, Siwa

LocationSiwa - Egypt
OwnerHayat Company for Industrialization and Development – Mansour Holding
Cost10 Million LE
StatusFully Executed & Operated
Date2002-2004

Scope of Work

Preparing the architectural design, landscape design, structural & execution drawings ,feasibility studies ,all architectural & structure design works ,electrical ,communications ,information technology networks ,monitoring and alert systems ,HVAC ,sanitary and utilities, construction supervision and project management.

Project Description

The project include site planning, engineering design and coordination with power zones for complete production facilities of mineral water.

The process, storage and refrigerators are included in a steel warehouse building; In addition, a concrete 3 storage building is designed to house locker rooms, admin and technical control rooms.

Total building area is 2000 m2.

All site works over site area of 4000 m2 were designed including fences, roads, handling equipment, loading platform, dock levelers, site flooring and weight bridges.Infrastructure work include underground water tanks, fire hydrants, sprinkling systems, electric middle voltage room and generators.

hayah