Scope of Work

Urban Planning, Road design, Structural design, electro-mechanical design, tender document & execution drawing preparation, and construction supervision

Project Description

The project aim is to re-plan the area of gate 27 at Alexandria port through replaning of areas outside and inside port fences taking into consideration the relation between gate 27 and the existing coastal highway exit in order to provide main axis connection between Alexandria port and surrounding highways.

The project included the design of all infrastructure networks, roads and parking lots of area 40 000 sq.m. In addition to the construction of three office buildings for commercial, administrative and security purposes. Two modern gates for entrance and exist was constructed each gate consists of four lanes for trucks and standard vehicles.

Layout works included construction of inner and outer port fences, entrance and exit gates to custom zone, truck parking areas and entrance, concrete flooring, road paving, plantation works, drainage and rainwater drainage networks, firefighting, lighting and information networks.

cargo