Scope of Work
Terminal Planning, feasibility studies, marine work design, Infrastructure & Structural design, electro-mechanical design, tender document & execution drawing preparation, and construction supervision.
Project Description
The project is a BOT tender for development of 143 000 m2 dry bulk terminal with all facilities. The terminal includes 3 quays with total length of 830 m. quay depth will be 14 meter to accommodate 60 000 DWT dry bulk carrier. Expected throughout put is 10-12 million ton/year. The project include quay construction, reclamation, dredging, infrastructure, Roads and yard works.